A big project in the end, if all 180 charging points materialize and the capacity grows in the same proportion (total capacity could be 10–15 MW). This could translate to ~5 MEUR in revenue for Kempower (a rough estimate). 32 charging points have been built so far. Keoma Energy has plans to open a total of 20 charging stations for trucks in the coming years, though likely smaller on average than this logistics center.
21 Likes