Inderes Coffee Room (Part 4)

A very recent perspective from a self-builder:

  • A very detailed cost estimate for a construction project calculated by an engineering firm: €540k. A large part of the costs are earthmoving works. The firm’s track record is such that the total realized costs of projects have been within 5-8% of the estimate.

  • Road, excavations, external HVAC, etc., were done last year. €120k of the budget used. Short math leaves €420k in remaining costs.

  • Recalculation of the cost estimate at the end of last week. Minimum €550k, probably closer to €600k, in remaining costs. An increase of 30 - 40%. Pricing power, at least towards the consumer, seems to be there.

  • At least for now, there seem to be more than enough projects underway. Good workers are somewhat difficult to find / at least they don’t have to compete on pricing.

We’ll see how many projects are left unfinished as costs jump in the middle of everything, and whether in a year or two, workers will be short of jobs when new projects aren’t started at the usual pace.

I previously asked for the price of a sheet metal roof for three buildings. Installed €8k / piece.

Last week, the offer was “updated”. Now the roofs cost €15k / piece.

The current price list is valid until the end of the month, then prices will rise again.

So as I mentioned, pricing power, at least towards the consumer, seems to be there :grimacing:

33 Likes