I’ve only skimmed the report so far, but a few hooks came to mind for the interview, if possible:
- The number of personnel has grown significantly; is this an increase in staff in preparation for 24/7 operations at the concentrator or some other production ramp-up, and if not, what is the reason?
- The jaw crusher was replaced in May; is this a case of “de-bottlenecking” the process, and could this increase the throughput of the concentrator?